Westbrook Associated Engineers

Tomorrow's Engineering Solutions Today

  • Home
  • About Us
  • Leadership
  • News
  • Services
    • Bridge Design
    • Construction Engineering
    • Construction Administration
    • Frac Sand Consulting Services
    • Marine Engineering
    • Roadway Design
    • Survey
  • Careers
  • Contact Us

Bridge Demolition – Virginia

May 18, 2016 By sitemanager

F25, Rt 1 over CSX Bridge
F25, Rt 1 over CSX Bridge

Westbrook performed Phase 1 & 2 demolition plans for the removal of the concrete deck and concrete girders. The challenge was setting a 550 TON crane on the existing bridge to remove the bridge slab and girders. WAE analyzed the existing bridge to ensure that the bridge could support the crane outriggers.

 

Filed Under: News

Latest News

  • Soil Nail Walls – Hoffman Estates, IL
  • CTH JB over Fox River
  • Chicago Harbor Lock Rehabilitation
  • I-74 River Bridge – Illinois Approach

Connect With Us

  • Email
  • Facebook
  • LinkedIn

Westbrook Associated Engineers, Inc.
619 East Hoxie Street
Spring Green, WI 53588
Phone (608) 588-7866

Copyright © 2022 · Westbrook Associated Engineers, Inc · Spring Green, WI · Design by CDRC