Westbrook completed oversight of a WisDOT construction project on STH 35 in Prairie du Chien this past summer. The project included reconstruction of 1.5 miles of STH 35 through a heavily populated business district of Prairie du Chien. The project consisted of removing the existing roadway, reconstruction of the storm sewer system, sanitary sewer, water main, lighting, traffic signals, sidewalk, grading for the new roadway, as well as concrete paving of the new roadway. Coordination between the prime contractor (Gerke Excavating) and all of the subcontractors, city of Prairie du Chien officials, business owners, residents, and WisDOT representatives was crucial during construction as the roadway was constructed in 3 phases to allow traffic flow to and from businesses and residences between phases. STH 35 was opened to traffic by the contract completion date with minor work (asphalt paving of the multi-use trail and restoration) to take place in the spring of 2019.
https://www.guttenbergpress.com/articles/2018/12/03/marquette-road-road-open